|
|
 |
| |
|
| |
 |
| |
|
| |
| Project |
:KTTM. |
| Location
|
:Jigani,
Bangalore. |
| Type |
:Industrial. |
| Area
|
:21000
Sqm |
| Cost |
:18
crores |
|
Status |
:Completed |
|
|
| |
|
| |
Brief info:
Kirloskar Toyoda Textile
Machinery Ltd,
a joint venture of the Kirloskar Group, India and
Toyada Group of Companies, Japan, was executed in
a record time of eleven months. Excellent scheduling
and planning by Toyota Engineers were the keys to
this success. The factory complex is spread over an
area of 20910.78 sq. Meters. It consists of five main
building:
1. The Administrative Block
2. The Production Block
3. Canteen Block
4. Services Block
5. Power House
The landscaped surroundings of the factory complex
enliven the surroundings ensure a healthy pollution
free environment to work in.
This
is a state of the art industrial complex. The planning
of the various facilities was designed as per the
specifications and standards of the Toyota Corporation.
Japanese Engineers were actively involved in designing
and executing the project. It is a landmark project
in terms of quality of construction and meticulous
planning.
|
| |
|
|